Strength Work
1 1/4 CHIN-UPS
4 x 4-6. Rest 45s.
SINGLE ARM GLUTE BRIDGE FLOOR PRESS
4 x 8-10 each. Rest 45s.
– 1-2 Warm-up sets
– Start weak side first
Metcon
“NUTSHELL”
For time:
25 Burpee Box Jumps (24/20)
50 S2OH (135/95)
25 Burpee Box Jumps
– Goal: Challenging effort. Leave some in the tank to push your last set of BBJ.
– Last tested: 5/11
Accessory Work
UPPER-BACK TRISET
3 x 8-10. No rest.
SIDE PLANK
3 x 30s each. Rest 60s.